Full Turnkey Project at Cement Works

Baldwin & Francis secure a major supply and design installation for a Cement Chlorine By-Pass Project

The project included installing an Alternative Fuel and raw material system (AFR) and a Chlorine Bypass system that reacts to an increased use of high chlorine content fuels.

This included a wide range of equipment and services from B&F including all Power and Control cabling installation and cable design, supply and install various 800Kva, 3.3KV-400V Transformer’s, various 400V Intelligent MCC’s, UPS panel’s, Indoor and outdoor lighting & a CCTV security system

The scope also required a bespoke Signals and Communication system for the Conveyors which was supplied by Baldwin & Francis.

Cauldon Cement Works Turnkey

Industry

Heavy Materials Handling & Aggregates

Products used

Medium-Voltage Motor Starters and Switchboards (MCC’s)

Low Voltage MCC’s and Switchboards

Location

Cauldon, UK

Client

lee avatar

Talk to a specialist about this project

Accreditations & memberships

Ready to get started?
Talk to us today

The Inspec Solutions Team has experience across all our sectors and many electrical installations. Get in touch with one of the team to see how Inspec Solutions can assist you with your project requirements.