Notice: Undefined index: option in D:\InetPub\Inspec Solutions\components\com_content\views\article\view.html.php on line 240

Notice: Undefined index: option in D:\InetPub\Inspec Solutions\components\com_content\views\article\view.html.php on line 248

Notice: Undefined index: option in D:\InetPub\Inspec Solutions\components\com_content\views\article\view.html.php on line 248

ITM Power - Riverside 33kg Plant

3-1

Inspec Solutions Ltd were responsible for the design, supply, manufacture, test, delivery and full documentation associated with the Main Control Panel, and the wiring of field devices for the Riverside 33kg Plant to be installed in California,USA.
The control panel designated the Main Control Panel housed the majority of a process control system that will automate the operation of a new water electrolysis and hydrogen drying plant. This plant will be operated on a site in California USA and is designed to produce hydrogen from water at a flow rate of up to 33 kg / day. The dried and compressed hydrogen gas, combined with gas from a stillage will be used for refuelling vehicles.
The control panel was designed in accordance with UL standards.
The control panel included a Siemens PLC, HMI, Ethernet communication devices, motor starters, feeders, power supplies, safety relays and termination points to allow connection to the plant.
All software engineering was provided by ITM Power for the PLC.

 

Engineering Standards Compliance :

  • CSA or UL approval stamp in addition to the CE mark
  • HazLoc, ATEX Directive, EN 60079-0 and the appropriate parts of the EN 60079 series
  • IEC 60364, BS 7671 and EN 60204-1

3-1